Resource Input Tab Improvement
Voting Open
I'd like the ability to better define resources inside of MindManager rather than having to go to MS Project to get the higher fidelity resource definition tab.
I need to be able to add multiple resources to a single branch and allocate differing levels of effort. As currently designed, the tool is ineffective.
For example, Electrical Engineer, Checker, Configuration Manager would all be allocated to a single branch at 100%, 15%, and 7% full time equivalent (FTE) respectively. Currently, the tool does not allow allocation less than 100%.
MindView already has this feature built in.