Calculation in roll-up
Voting Open
When rolling up a task in a branch structure, duration, effort, costs and progress are displayed.
Only branches marked with the ‘Progress in %’ icon are included in the progress calculation.
If progress is not set to 0% immediately when the task is created, it is not included in the calculation. This means the result is incorrect.
With a small project, I can see that something is wrong. With large projects, it may not be noticeable.
My suggestion:
In the roll-up, all branches must be included in the progress calculation, even if the icon is missing.
If I do not wish to include a task in the calculation, I can actively exclude it in the task details.

I like this idea
---